Monitoring

There are no incidents
Incident log
Service:
Virtual Machines
Data center:
Almaty
Beginning of the event:
29.04.2026 09:57
End of the event:
29.04.2026 10:09
Duration:
12 minutes
Description:
A failure occurred on one of the virtualization nodes in Almaty 2 Data Center. Timeline of events: 04/29/2026 10:09 AM VM recovery confirmed. 04/29/2026 09:57 AM A failure occurred on the virtualization node. The VM was restored to operation on a neighboring node with a reboot.
Service:
Virtual Machines
Data center:
Almaty
Beginning of the event:
28.04.2026 21:17
End of the event:
28.04.2026 21:19
Duration:
2 minutes
Description:
The SLAVA data center experienced a failure on one of the virtualization nodes. Despite the failure on the virtualization node, the fault-tolerant platform worked normally, and unavailability was 5 minutes. Timeline of events: 04/28/2026 21:19 VM recovery is confirmed. 04/28/2026 21:17 A failure occurred on the virtualization node. The VM was restored to a neighboring node with a reboot.